Cement dust on a ±15.6 MWp solar plant in North West Province
+7.2% more current than comparable uncleaned strings, same irradiance window
A cleaned string read 10.4 A against 9.7 A on comparable uncleaned strings.
Case studies
Our own South African pilot, alongside field studies Chemitek has published with plant operators and research institutes. Every number says what it was compared against, over what period, and who measured it.

+7.2% more current than comparable uncleaned strings, same irradiance window
A cleaned string read 10.4 A against 9.7 A on comparable uncleaned strings.
Chemitek field studies
Chemitek’s own case studies, from Chile and Spain to Vietnam and India. We summarise each one and link the original report where it’s public, so you can check the method yourself.









Reading the numbers
Soiling results are easy to overstate. These are the checks we apply to every case on this site, and to every pilot we run.
Treated strings against comparable untreated strings, or a clean reference inverter, in the same irradiance window. Never one string before and after.
One day, one month or nine months: the period changes what a number means. Each case says how long it ran.
Our own pilots are marked as RenewChem. Chemitek’s studies link to the original report or peer-reviewed paper.
Talk to an engineer about a free pilot, a soiling problem or a Chemitek order.